New Clamp Designed and Re-Welded to Support Piping to allow for Vertical Movement and Stress Relief
Heliport Panel Repairs
Hurricanes Take the Panels off
Ridgewater Services assures that Replacement Panels are to your exact Spec's
Sump Tank Hanging after Hurricane Ike
Previous Design had No Angle Supports to prevent Horizontal Movement
After Safely gaining Control of this unit, Repairs were Performed and Proper Angle Supports Systems installed.
Missing Walkway/Bridge
High Seas Removed this Bridge during Hurricane Ike
Bridge Rebuilt as per Original Spec's and Installed
Hurricane Damage to Grating and Handrails
Waves and Wind Damaged Grating, Handrails and Removed Well Control Panel
As Good as New
Well Control Panel Missing
Waves took the Well Control Panel from the Platform
Had a New Well Control Panel Designed and Installed at a Higher/Remote Location to prevent losing it again.
Exposed and Damaged 16" Pipeline in Sabine Lake
Storms Uncovered 150' of Pipeline
Temporary repairs to Coatings, New Cathotic Protection, Certified Concrete Bag Covering for Temporary Security and Pilings Set as per USCG Regulations until Permanent Repairs could be made.
Well Control Panel Damaged and Hanging
Storm Damage to Entire Structure
Repaired all Storm Damage, Repaired Well Control Panel, Tested and Returned to Operations
Stairwell and Handrails Missing
Handrails and Grating Removed and Stairway Missing
Made all Repairs for Safe Access to the Structure, Redesigned and Replaced Stairway, Handrails and Grating